Close Menu
    GCC TelegraphGCC Telegraph
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    GCC TelegraphGCC Telegraph
    Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Related Posts

    Hero Esports to Stage Middle East’s First Humanoid Robot Kickboxing Event in Riyadh

    August 31, 2026

    Microsoft and HUMAIN Expand Strategic Collaboration at LEAP 2026 with New Enterprise AI Offering and AI PC

    August 31, 2026

    HUMAIN and Applied Intuition Announce Strategic Collaboration to Deploy Physical AI Across Saudi Arabia, Starting with Autonomous Trucking

    August 31, 2026

    AMD, Cisco and HUMAIN Expand Saudi Arabia’s AI Infrastructure as AMD Instinct Systems Go Live

    August 31, 2026

    HUMAIN and KORA Partner to Build Operating System at LEAP 2026

    August 31, 2026

    HUMAIN and MinIO Announce Strategic Partnership to Build AI Data Fabric

    August 31, 2026
    Latest News

    Sichuan tremor as magnitude 5.1 earthquake strikes Longchang

    August 29, 2026

    BEIJING / RankWire.AI / – A moderate 5.1-magnitude earthquake struck Longchang City in southwest China’s…

    Kisangani hub active as DR Congo launches Ebola vaccination

    August 29, 2026

    Algeria wildfires leave 12 dead and 54 injured in north

    August 27, 2026

    South Korea inbound tourism rises 20.8% in July

    August 26, 2026

    Air Arabia sets five weekly Sharjah Gdansk flights

    August 26, 2026

    Brent crude steadies after 2% drop amid Iran sanctions

    August 25, 2026

    EU expands Ebola response with €2.1 million PCR tests

    August 25, 2026

    South Korea starts first Arctic container ship trial

    August 24, 2026
    © 2026 GCC Telegraph | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.